Manager, Wind Construction (Electrical Balance of Plant)

Vena Group, Philippines

What our tracking knows about this posting

Published on 11 August 2026 ยท first appeared in our records on 27 September 2026.

Stable posting: first seen on 27 September 2026, with no abnormal reposting.

This posting shows no salary, while 5% of open postings in the same sector in this country (Philippines) do.

View the posting at the employer Have my resume reviewed for this job
) construction activities for a utility scale wind farm project. The role includes supervision of cabling, substations... Supervision representatives Monitoring compliance with technological processes during construction Verify As-Built documentation...

Other recent postings in the same sector