Manager, Wind Construction (Electrical Balance of Plant)

Vena Group, Philippines

What our tracking knows about this posting

Published on 10 August 2026 · first appeared in our records on 27 September 2026.

Stable posting: first seen on 27 September 2026, with no abnormal reposting.

This posting shows no salary, while 4% of open postings in the same sector in this country (Philippines) do.

View the posting at the employer Have my resume reviewed for this job
) construction activities for a utility‑scale wind farm project. The role includes supervision of cabling, substations... Monitoring compliance with technological processes during construction Verify As-Built documentation Participate in Permit...

Other recent postings in the same sector