Field Safety Advisor (Data Center Construction)

Valard Construction — Port Hawkesbury, CA — inconnu

What our tracking knows about this posting

Published on 1 September 2026 · first appeared in our records on 2 September 2026.

Stable posting: first seen on 2 September 2026, with no abnormal reposting.

This posting shows no salary — 11% of open produit postings in CA do.

View the posting at the employer Have my resume reviewed for this job
Our Data Center group is currently looking to add a Field Safety Advisor to the team, based in Port Hawkesbury, NS. Reporting to the Regional Safety Lead, this position provides support to supervisors, foremen and workers in the field and leadership / coordination of the day-to-day safety requirements for the project.  This position plays an important role in ensuring that Valard’s safety culture has been established and adhered to in the field. Please Note: this is a field-based position working a shift of 14 days on / 7 days off (no work on Sundays), with 10 hour days. We offer Fly In / Fly Out from any major airport.  LOA provided or we can provide partial LOA and accommodations if needed. Duties and Responsibilities • Be a visible presence and safety resource in the field to ensure a safe work environment for all Valard employees, contractors, and visitors as per the Site Safety Management Plan (SMP) • Communicate, coach and assist field staff to ensure that all safety expectations are met • Participate in, and assist the supervisors and foreman with, investigation of incidents to determine root cause, and corrective actions • Participate in regular meetings with project safety teams to review issues, trends and upcoming conditions or events to ensure safety obligations are carried out as per client agreement and communicated to the Project Manager and Supervisors • Review tailboards daily to ensure that hazards are addressed, and a mitigation process is in place; provide feedback to workers to assist them in being compliant • Perform observations, inspections, emergency preparedness drills, and review / communicate the findings via safety meetings and postings • Facilitate weekly safety meetings, capture minutes and prepare weekly / monthly safety reports • Provide support to the supervisors and foreman to ensure that JSAs are developed and reviewed with the crews and available at the work site • Apply and reinforce the requirements of Valard's Health, Safety and Environmental Manual across all field activities • Regularly review and be familiar with all applicable legislation, and applicable standards and inform Project Manager(s) of any relevant changes • Post-Secondary education in a related field • 5 years of construction site safety experience • a combination of education and experience may be considered • National Construction Safety Officer (NCSO) or Canadian Registered Safety Technician (CRST) Certification • Proven experience dealing with client requirements and providing administrative assistance with matters relating to safety • Have and maintain a valid driver's license and provide a driver's abstract (a record) for review • Experience with Microsoft Office applications Preferred Skills / Qualifications • Demonstrated experience supporting electrical or data center construction projects • CRSP (Canadian Registered Safety Professional) certification • Demonstrated familiarity with applicable provincial legislations • Root cause investigation experience