Linesight, Dublin, Ireland
What our tracking knows about this posting
Published on 10 September 2026 · first appeared in our records on 8 October 2026.
Stable posting: first seen on 8 October 2026, with no abnormal reposting.
This posting shows no salary, while 4% of open postings in the same sector in this country (Ireland) do.